García León, A.A. (2018) “Heuristic to minimize makespan and the maximum delay in the problem of scheduling Job-Shop multi-resource with linear routes”, Indagare, (6), pp. 26–33. Available at: https://revistas.unibague.edu.co/indagare/article/view/150 (Accessed: 18 October 2026).